ITTC – Recommended Procedures and Guidelines |
ITTC-推荐 程序和指南 |
Speed and Power Trials Part I Preparation and Conduct |
速度和功率试验 第一部分准备和实施 |
1.PURPOSE |
1.目的 |
The primary purpose of speed-power trials is to determine ship performance in terms of speed,power and propeller revolutions under prescribed ship conditions, and thereby verifying the satisfactory attainment of the contractually stipulated Ship Speed and to provide the Ship Speed for the calculation of the Energy Efficiency Design Index(EEDI) as required by IMO. |
速度动力试验的主要目的是在规定的条件下,以确定船舶性能的速度,功率和螺旋桨转速,从而验证了符合要求的合同规定的航速为能效设计指数计算提供船舶的速度(EEDI)。 |
The present Recommended Procedure concerns the preparation and execution of speed power trials and has been defined by the 27thITTC Specialist Committee on the Performance of Ships in Service. In this work the Committee took into account: |
目前推荐的程序问题关系到速度功率试验的准备和执行,而且在船舶使用性能上已被27thittc专家委员会定义。在这工作中委员会考虑在内的有: |
Recommendations 23rd ITTC 2002; Ref[1], ISO 19019, 2002; Ref [2], ISO 15016, 2002; Ref [3], STA-JIP, 2006; Ref [4]. |
建议第二十三ITTC 2002;文献[ 1 ], ISO 19019,2002;文献[ 2 ], ISO 15016,2002;文献[ 3 ], STA-JIP,2006;文献[ 4 ]。 |
For the analysis and reporting of speed-power trials, reference is made to Part II of this Recommended Procedure. The purpose of this document Part I which is applicable to commercial ships of displacement type, is to define and specify: |
对于速度功率试验的分析和报告,参照本建议程序的第二部分。本文档的第一部分的目的适用于商业船舶位移管理型,是为了定义和说明: |
the responsibility of each party involved, the trial preparations, the vesselrsquo;s condition, the limiting weather and sea conditions, the trial procedure, the execution of the trial, the measurements required, the data acquisition and recording and the processing of the results. |
参与各方的责任, 试制剂, 船的情况, 限制天气和海洋条件, 实验程序, 实验的执行, 测量要求, 数据采集与记录 结果的处理。 |
The contracted ship speed and the speed for EEDI should be determined for stipulated conditions which are defined at specific draughts (contract draught and EEDI draught) and usually for ideal environmental conditions i.e. no wind, no waves, no current, deep water. |
合同船舶的速度和EEDI速度应当规定条件下,在特定的吃水深度下定义(合同吃水和EEDI吃水),通常为理想环境条件下,即没有风,没有波澜,没有深水。 |
Normally, such stipulated conditions are not experienced during the actual trials. In practice,certain corrections for the environmental conditions, as for water depth, wind, waves and deviating ship draught have to be considered. For this purpose not only the Shaft Power and Ship Speed are measured but also relevant ship data and environmental conditions during the speed-power trials. |
通常情况下,这样的规定条件在实际试验中没有经验。在实践中,对环境条件的某些修正,如水深、风、浪、船吃水必须考虑。为了这个目的,不仅是轴功率和船舶的速度要进行测量,而且相关的船舶数据和环境条件下的速度功率也要试验。 |
All trial procedures and measurements should be conducted in such a way that the speed at Contract power and the speed at EEDI Power are derived within 0.1 knots and the Shaft Power within 2%. |
所有的试验程序和测量应以这样一种方式,是合同功率和EEDI功率的速度在0.1节以内得到,轴功率在2%以内。 |
2.DEFINITIONS |
2.定义 |
Brake Power: power delivered by the output coupling of the propulsion machinery. Contract Power: Shaft Power that is stipulated in the newbuilding or conversion contract between Shipbuilder and Owner. Docking Report: report that documents the condition of the ship hull and propulsors (available from the most recent dry-docking). Double Run: two consecutive Speed Runs at the same power setting on reciprocal heading. EEDI: Energy Efficiency Design Index as formulated by IMO. EEDI Power:Shaft Power that is stipulated by the EEDI regulations. Ideal Conditions: ideal weather and sea condition;deep water, no wind, no waves and no current. Owner: party that signed the new building or conversion contract with the Shipbuilder. |
制动功率:动力机械输出耦合的功率。 合同功率:造船企业与业主之间的新合同规定或转换的轴功率。 对接报告:船体和推进器的报告文件(可从最近的干船坞获得)。 双运行:连续两个速度在二个方向上运行。 EEDI:能效设计指数制定的。 EEDI功率:通过EEDI法规规定的轴功率 理想条件:理想的天气和海洋条件;深水,没有风,没有波浪,没有电流。 业主:签署新的建筑或转换合同与造船方。是由EEDI法规规定。 |
Propeller Pitch: the design pitch, also for controllable pitch propellers. Running Pitch: the operating pitch of a CPP. Shaft Power: net power supplied by the propulsion machinery to the propulsion shafting after passing through all speed-reducing and other transmission devices and after power for all attached auxiliaries has been taken off. Shipbuilder: ship yard that signed the newbuilding or conversion contract with the Owner. Ship Speed: speed that is realised under the stipulated conditions. “Contract Speed” refers to the contractual conditions agreed. “EEDI Speed” refers to the conditions specified by IMO. Sister Ships: ships with identical main dimensions, body lines and propulsor system built in a series by the same Shipbuilder. S/P Trials: speed-power trials to establish the Speed-Power relation of the vessel. Speed Run: ship track with specified heading,distance and duration over which Ship Speed and Shaft Power are measured. The shiprsquo;s speed during a Speed Run is derived from the distance b 剩余内容已隐藏,支付完成后下载完整资料 资料编号:[147782],资料为PDF文档或Word文档,PDF文档可免费转换为Word |